RESEARCH RECORD

The plastered pool beside Siloam Pool

Zvi Greenhut and Gabriel Mazor present a water installation on Siloam Road and the evidence supporting its construction date.

This record provides bibliographic details and independent reading notes. The full study was written by the authors listed in the publication details; the link leads to its source.

Dating through complementary contexts

A plastered pool was partly exposed east of Siloam Pool beside the dam wall. The study proposes construction in the later first century CE using plaster, pottery and coins from its foundations. 1.

Dating gains strength when different methods and observations converge, but ask what each actually dates. Foundation material, plaster and a use surface represent different actions. Drawing their relationships helps assess whether they indicate construction, repair or later use.

Read alongside the Jerusalem purification-and-bathing study to distinguish one installation from wider questions about pool identification and function. The dating guide provides tools for assessing how the evidence fits together.

Source

Sources and further reading

The research and references behind this page. Rights to external content remain with their owners.

  1. 1 The City of David (‘Ir David), Siloam Road: A Plastered Pool adjacent to the Siloam Pool

    Zvi Greenhut, Gabriel Mazor · 2020 · Checked

Continue from here

Follow the next connection

Every card comes from a documented relation or an editorial link. The reason line explains the connection.

Reading, accessibility & privacy tools

Adjust the reading experience to suit you. These tools complement your browser and device accessibility settings. Changes apply to this page; they are kept for another visit only if you allowed that in the privacy dialog.